*Kindly share your resume at [email protected]
<[email protected]>*

*Position: Network Engineers*

*Location: Irvine, CA*

*Duration: 6+ Month*



Two level 3 engineers (CCIE level)



a. Technologies (see specific descriptions in the assessment section below)

·         RS core

·         Wireless

·         Smaller degree of security (IPS only)

·         UC



Local resources are preferred due to the short time frame of the project

·                     Remediation efforts may be able to take place remotely

·                     There will be no travel to the actual sites.  Local
is consider

·                     If engineers are to be supplied outside of Irvine,
then the expectation is M-F.  No short weeks

·                     The travel budget to fly someone in each week is not
appealable

c. Resources have the potential to stay on through the end of the year at a
minimum



Packaged Tiger Team Approach for 10 primary sites in scope.  There are 4
alternate sites in case any of the initial 10 sites don’t have much work to
be completed



a.       Pre-assessment survey

·         Baseline current network performance



1.       Measured metrics

·         Develop benchmarks with IS (internal IT) managers

2.       User perception (10-20 users per site)

3.       A network tools budget is allocated though the specific tools have
not decided upon yet

·         There are instances of Solar Winds in existence today and sounds
like the preference

·         Locally managed by sites vs. centrally managed tools are the
preference

b.      Assessment

·         Examine all technology areas at each site (RS, Wireless,
Security, possibly Zscalar, etc.)

1.       Configuration standards

·         Gap analysis for conformity to standards

2.       Throughput needed vs. available

3.       If emergency fixes are identified during the assessment then there
is a client process to               make these changes immediately.  We
will need to elaborate on this prior to engagement

4.       Assessment components

·         Physical

·         Physical connectivity for network design

·         Power capacity and UPS

·         HVAC

b.      R/S LAN Core

·         Interface configs, uplinks

·         Equipment health check

·         QoS



1.       identify current QoS settings

·         VLAN switch port settings

·         SVI

·         Spanning tree

·         DHCP



c.       WAN

·         Circuit analysis

·         Default route analysis

·         PBR

·         IPSec VPN

·         BGP/iBGP

·         MPLS

·         QoS



1.       Identify that carrier is providing their level of QoS and SLAs

·         IPSLA settings

·         Sizing

·         Equipment health check



d.      Wireless

·         Known issue at all sites.  To what extent needs remediation?

·         Access point models and level of code

·         Configuration, trunking, HREAP

·         AP connectivity test

·         Failover configuration on WLC

·         General WLC configuration

·         Wireless VLAN Configuration

·         No current 802.11x over wireless

·         Desire is to have softphone support over wireless Guest wireless
standards and pen testing.



e.      IPS

·         IOS version

·         Sizing for throughput

·         Interface configs

·         Session utilization

·         Policy verification.  What is being inspected and blocked?





f.        UC

·         Basic configuration issues

·         High availability check over

·         Voice quality analysis



1.       Completed call records

·         Voice CUBE capacity



g.       No load balancing included

c.       Remediation Plan

·         Recommended configuration changes

·         Recommended equipment changes and/or uplifts

·         Recommended changes to bandwidth and/or WAN

·         Depending on the impact of the remediation plan then after hours
work may be required



d.      Post Assessment Survey

·         Mirror pre-assessment survey in all areas to identify improvements

·         Current network performance



1.       Measured metrics

·         Develop benchmarks with IS (internal IT) managers

2.       User perception (10-20 users per site)





*Thanks and Regards*



*Arvind Nagar*

*Sr. Technical Recruiter *

*Email- [email protected] <[email protected]>*

*Direct-408-457-9381 Ext-4073 !! Gtalk- arvindnagar.777 !! Yahoo- *
*arvindnagar951*

*Web: **www.idctechnologies.com* <http://www.idctechnologies.com/>

*IDC Technologies, Inc.,1851 McCarthy Boulevard, Suite 116, Milpitas, CA ,
USA, 95035*

-- 
You received this message because you are subscribed to the Google Groups 
"USITCV" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/usitcv.
For more options, visit https://groups.google.com/d/optout.

Reply via email to