*HP 3PAR-VMAX Consultant* *Location: Rockville, MD *
*Duration: 8 Months* *Phone/Skype* SCOPE: Planning & Design Requirements gathering and review of existing environment Execute EMC host grabs / reports Host interoperability and compatibility review Identify HBA hardware, driver, firmware requirements Identify PowerPath/multi-pathing software requirements Identify OS version and/or patch level requirements VMAX and SAN Design Workbook (DWB) development and documentation HP 3PAR Hosts 20 Physical Oracle & SQL clusters 71 ESX - 186 Datastores Identify, document, and submit VMAX BIN file requirements Conduct formal design review session and obtain customer sign-off Storage Implementation Coordinate Installation of VMAX hardware and base configuration – EMC to perform hardware installation, BIN file configuration, and BIN file loading SAN connectivity of VMAX engines Install management software and eLicenses (SE, SMC, Zones, GKs, etc.) Configure VMAX Virtual Pools and TDEVs (migration targets) per DWB Configure VMAX Provisioning (IGs, SGs, PGs, MVs) per DWB to support ESX data migration Configure VMAX eNAS per DWB to support migration from VNX Documentation and Knowledge Sharing Update DWB to include any changes made to the design during implementation Conduct knowledge transfer to address any questions or knowledge gaps from the implementation *Thanks and Regards* *Shweta Ojha* *Nityo Infotech Corp.* *Phone:* 609-378-1158 *E-mail:* [email protected] *Hangout:* sojha1290 http://www.nityo.com -- You received this message because you are subscribed to the Google Groups "USITCV" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To post to this group, send email to [email protected]. Visit this group at https://groups.google.com/group/usitcv. For more options, visit https://groups.google.com/d/optout.
