In my USMA 17921 I wrote:

>My memory is that a tool and die manufacturer in Sheffield, England, said
>that going metric had produced a 15% reduction in design time.  The (U.S.)
>reported design time saving of as much as 5%

I meant to say that the (U.S.) Department of Defense reported design time
saving of as much as 5%

Joseph B.Reid
17 Glebe Road West
Toronto  M5P 1C8             TEL. 416-486-6071

Reply via email to