In my USMA 17921 I wrote: >My memory is that a tool and die manufacturer in Sheffield, England, said >that going metric had produced a 15% reduction in design time. The (U.S.) >reported design time saving of as much as 5%
I meant to say that the (U.S.) Department of Defense reported design time saving of as much as 5% Joseph B.Reid 17 Glebe Road West Toronto M5P 1C8 TEL. 416-486-6071
