In USMA 24311 I asked:

At 19:33 -0500 03/01/01, Joseph B. Reid wrote:

--- Transrapid International <[EMAIL PROTECTED]> in USMA 245291 wrote:

 in the superspeed Transrapid maglev system.

 > The track gauge is 2.8 m, the guideway pitch depends
 on the speed of the
 trains (< 300 km/h: 4.4 m, < 400 km/h: 4.8 m, < 500
 > km/h: 5.1 m).

Can anyone explain what "guideway pitch" is?


Nobody has explained how a track with a width 2.8 m can have a guideway pitch of 4.4 m, 4.8 m or 5.1 m. I would expect the maximum of the pitch to be 2.8 m, which would be the case of the track being turned completely on its side.
--
Joseph B. Reid
17 Glebe Road West
Toronto M5P 1C8 Telephone 416-486-6071

Reply via email to