donald smith wrote:
> Vic, no short cut. Figure 2-3 hours and watch your fingers.
Hi Don, figured that much out, Got the old mounts out however the
machinist at work machined the mounts to 1.10" as per the drawing cant
get them in the frame, I mic'd the frame at about 1.098. So tomorrow i'll
bring them in to work to see if he can turn them down a thou or two. Also
you mentioned the swing arm, figured with a year old bike with 5500
miles the bearings should still be good, what you think ?
I'm also taking pictures of the process, if they come out it should be
a good addition to tips page. So tomorrow hopefully i'll be done and
tuesday riding.
Vic
99max (in little pieces)
.............................................
To unsubscribe go to http://www.sayegh.org/unsubscribe.htm
.............................................