There are three phases in scavenger.
1. Scavenge root.
2. Scavenge old_to_new objects.
3. Drain out the copy and promotion lists.

Now, step 1  runs on the main thread. And 2 and 3 are packed as a task job 
and run in parallel (both main and worker thread).

I wonder if it possible to run step 2 on worker thread when running step 1 
on main thread.

Thanks.

-- 
-- 
v8-dev mailing list
[email protected]
http://groups.google.com/group/v8-dev
--- 
You received this message because you are subscribed to the Google Groups 
"v8-dev" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To view this discussion on the web visit 
https://groups.google.com/d/msgid/v8-dev/668fe343-1197-49c0-b45d-736427b622dcn%40googlegroups.com.

Reply via email to