There are three phases in scavenger. 1. Scavenge root. 2. Scavenge old_to_new objects. 3. Drain out the copy and promotion lists.
Now, step 1 runs on the main thread. And 2 and 3 are packed as a task job and run in parallel (both main and worker thread). I wonder if it possible to run step 2 on worker thread when running step 1 on main thread. Thanks. -- -- v8-dev mailing list [email protected] http://groups.google.com/group/v8-dev --- You received this message because you are subscribed to the Google Groups "v8-dev" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To view this discussion on the web visit https://groups.google.com/d/msgid/v8-dev/668fe343-1197-49c0-b45d-736427b622dcn%40googlegroups.com.
