Oddly enough, i've been thinking about doing my whole water-system from freshwater to greywater in 4" abs or pvc schedule 40, strapped up against the underside of the floor, inside the belly-pan. Kind of like 'mini-tanks' in series, connected with pex, or something like that.
 
Tuna

Reply via email to