On Fri, 27 Jul 2007, Kevin Whittaker wrote:
> Oh... Sorry about that. > > That is the easy part. > > Under the Schedule, within the policy, I changed the media multiplexing > to 1. The RMAN script starts 4 channels, and sees the schedule says > only 1 multiplex then it sends them to different tapes. This is good in a sense, but say you have 10 tape drives for example. If you are multiplexing other backups with the DB backups, does the RMAN policy write with LEVEL 1 multiplexing to separatae tapes and the other backups still take place for the other (assume MPX=4) 3 levels of multiplexing on the drive? Or does the MPX=1 job utilize the entire tape drive? Does it make sense what I am mentioning? Essentially you'd want separate tape media IDs for each server but you still want other servers writing for the other 3 levels of MPX on that tape. Justin. _______________________________________________ Veritas-bu maillist - [email protected] http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
