On 04/30/2014 02:01 PM, ed breya wrote: > When I applied for the permit from the > county, this caused nothing but grief and confusion - they didn't > understand, and neither did PGE, why anyone would want a second meter.
At my last house when the place was rewired after a fire, I anticipated this problem. I had the electrical contractor move the meter base about 4 ft away from the breaker panel and install the service disconnect on the far side of the meter. That gave me about 5 ft of conduit inside the house from the wall penetration to the breaker panel - plenty of room to cut in and add the second meter base after the inspection. Worked like a champ. John -- John DeArmond Tellico Plains, Occupied TN http://www.fluxeon.com <-- THE source for induction heaters http://www.neon-john.com <-- email from here http://www.johndearmond.com <-- Best damned Blog on the net PGP key: wwwkeys.pgp.net: BCB68D77 _______________________________________________ volt-nuts mailing list -- [email protected] To unsubscribe, go to https://www.febo.com/cgi-bin/mailman/listinfo/volt-nuts and follow the instructions there.
