A once a century deluge came through the culverts of Interstate 25,
an irrigation canal-levee, through the culvert of the Burlington Northern
railroad mainline to San Francisco, and over a large irrigation
canal plus 4 acres of pastureland,and deposited about 4 inches of muddy (un-activated water?)
in the ~ 1800 square foot basement (~4,500 gallons) of our pastoral country
home, messing up about 900 ft^2 of carpet and the showing by the realtor.
There will be a septic tank truck (2,000 + gal capacity) pumping it out tomorrow
and a crew with brooms, squeegees and (Wet-Vacs?) doing the clean-up chore.
The water is free (plus Shipping and Handling) if anyone wants some
for their Joe Cell experiments.
Fred

