Fukushima 1 first went critical in October of 1970. It was a 460 MW boiling water reactor supplied by GE. There are a total of 8 reactors at this installation.
T
Fukushima 1 first went critical in October of 1970. It was a 460 MW boiling water reactor supplied by GE. There are a total of 8 reactors at this installation.
T