Some probably too little too late ideas follow.

It seems possible to use a crane (one is on site, but maybe not big enough) to lift a fire hose or cement hose with a steel pipe on the end up over the top of the building structure and to lower the pipe down into the building at the spent fuel pool location, which is right under the roof. It should then be possible to pump a coolant into the cooling pond through the hose and pipe.

For a reactor with the roof intact, a shaped charge should be sufficient to blow a sufficient sized hole in the roof.

One idea for a coolant is to use a boron carbide pellet with water (or boric acid) slurry. That way, if the water evaporates, the boron carbide remains to reduce the degree of criticality. If there is sufficient boron carbide then water loss may actually further reduce the degree of criticality, though the temperature would rise and the fuel rod cladding may oxidize. Still, when a rubble pile forms, it will be full of boron carbide, which can withstand very high temperatures, and prevent criticality, eliminating the china syndrome possibility.

It may be feasible to use a cement pumper truck to pump such a slurry.

The main problem with this idea may be locating the tons of boron carbide pellets needed. Boron carbide should be around a many forms, including the form of industrial abrasives. A mix of boron carbide powders, granules and pellets in a slurry may be very effective due to the high packing coefficient, but might eliminate any prospect of water cooling.

Another problem could be that there is a big crack or hole that is letting the water out. If the crack is too big, then the pellets should leak out also. However, enough might remain inside to be effective for most of the fuel rods, especially if the pellets etc. sinter together in the process.

Best regards,

Horace Heffner