Alan J Fletcher <[email protected]> wrote:
> And (regrettably) incomplete. We know that the power to the resistor was > being cycled on and off, but not the actual duty ratio! > The duty cycle is 100% after 19:40. It says: "19:40 Power was increased to the maximum value, “9.” [blue box control], and power was at this point constantly switched on. . . ." I take that to mean a 100% duty cycle. We can ask Lewan if you suspect it means anything else. See the note for 19:10. "Input AC current was 11.6 A. Over-all AC voltage was 218 volts. DC voltage was zero." 2.5 kW. Lewan uses 2.6 kW. Water came out -- but we don't know its temperature. > Well, it would have boiled away a lot more if it was much hotter than 100°C. You can see it steaming but it would have burst into a lot of steam if it had been superheated. Ask Lewan if you have questions. Don't bother him with trivial stuff. Read everything carefully before you ask. - Jed

