Am 31.10.2011 22:18, schrieb Jed Rothwell:

Anyway, there is no problem cooling down equipment in this situation. I have seen large power company transformers behind shopping malls placed in small confined areas, sometimes bricked in to keep people away from them. They produce a great deal of waste heat. It goes straight up. Not a problem.

A 10 MW transformer, if it has an efficiency of 99% produces 10 kW waste heat. That is another dimension. Without telling numbers this cannot been compared.
We are talking about 470 kW waste heat.

Reply via email to