Just so we can put in context what Defkalion are saying about the 45 kW Hyperion system, here is the LCOE based on the installed price of EUR 5,500 and thermal MWhs generated at $3.95 / MWh or $0.00395 / kWh: https://picasaweb.google.com/lh/photo/_RNurYKnwzoKkBzY1KKyx9MTjNZETYmyPJy0liipFm0?feat=directlink The heat price of $0.00395 / kWh is so low as to not matter in any practical sense. Does this mean we may see LENR generated heat used for bulk space heating / cooling and industrial process requirements, with LENR electricity generation used only for electrical devices. Interesting how the various cost components relate in the pie diagram.

AG

Reply via email to