The box may contain a primary coolant circulating pump that is speed controlled by the electronics as part of the regulation of the energy generation process.

AG


On 18/01/2012 11:48 PM, Energy Liberator wrote:
It's remarkable how quick things change with this. In a previous post on
JONP a few days ago, Rossi specified a size of 40x40x40, now it's
significantly smaller. It's great that he can now provide hot water too
as that increases the appeal even further allowing for complete
replacement of conventional gas / oil boilers in the home.

I'm not familiar with how UL certification works but wouldn't these
changes, especially such a size change, affect the certification
process? I'm assuming the Rossi is only getting certification for the
core reactor unit and everything else will be 'bolt on' afterwards.

Reply via email to