Andrea Rossi
September 10th, 2012 at 3:14 PM

DEAR READERS:

TODAY A BIG MESS IS POPPED OUT FROM A SHORT MEASUREMENT THAT HAS BEEN DONE THE LAST WEEK. I REALLY HAVE DIFFICULTY TO UNDERSTAND WHY SOME PERSONS HAVE TOTALLY IGNORED WHAT I CLEARLY SAID IN MY PRELIMINAR STATEMENT IN THE REPORT PRESENTED IN ZURICH: I SAID THAT ALL THE DATA ARE NOT FINAL, THE VALIDATION, THE R&D, THE CERTIFICATION OF THE HIGH TEMPERATURE REACTOR ARE IN COURSE AND THE FINAL REPORT WILL BE RELEASED WITHIN MONTHS. NOW, A GUY COMES HERE (INVITED FROM US) MAKES SOME HOUR OF MEASUREMENT, GOES AWAY AND A WEEK AFTER MAKES A PRESS CONFERENCE LIKE HE HAS MADE A PROCESS OF VALIDATION THAT TAKES MONTHES: DOES THIS MAKE ANY SENSE? I AM VERY CONFUSED. ANYWAY:
THE EXTERNAL SURFACE OF OUR REACTOR IS 933 CM^2
THE TEMPERATURE WE REACH WHEN IT IS STABLE IS 1050 CELSIUS ON THE EXTERNAL SURFACE. THE GUY IS ESCAPED FROM US BEFORE THE REACTOR REACHED THE DUE TEMPERATURE SAYING HE HAD SEEN ENOUGH ( ENOUGH OF WHAT?).
THE MAX POWER OF THE RESISTANCE IS 8 kW
WITH THESE NUMBERS ONLY, THE ENERGY PRODUCED IS ABOUT 17 kWH/H, WITHOUT CONSIDERING THE ENERGY FROM THE INTERNAL CYLINDER (WHATEVER IT IS), THE CONVECTION ENERGY ( WHICH IS A LOT).
NOW: IN THE NEXT 2 MONTHS WE HAVE TO ARRIVE TO A PRECISE DETERMINATION OF THE MAXIMUM COP, BUT JUST FROM THESE VERY BASIC ANC CONSTANT NUMBERS ( INDIPENDENT FROM THE MEASUREMENTS OF AMPS AND OHMS) WE HAVE A COP AROUND 2.
THE ITER PROGRAM, TO MAKE ENERGY WITH NUCLEAR HOT FUSION, IS COSTED 100 BILLION OF EUROS AND GOT NOT EVEN 1.01 OF COP.
SO, WHAT ?
IN THE FINAL REPORT YOU WILL SEE A LIST OF MANY PROFESSORS AND ENGINEERS WHO ARE MAKING ALL THE NECESSARY MEASUREMENTS FOR MONTHS.
LET ME WORK, AND LET THE TEAM OF PROFESSORS AND ENGINEERS WHO ARE MAKING THE VALIDATION ANDE CERTIFICATION WORK. THIS TIME, ANYWAY, WE GOT FRIENDLY FIRE, IT APPEARS.
ANDREA ROSSI

Reply via email to