I would think that a modest sized test facility would be an ideal way to evaluate their device. Hopefully it can be scaled up in the near future if operation within the power grid is the desired outcome.
Dave -----Original Message----- From: Jeff Berkowitz <[email protected]> To: vortex-l <[email protected]> Sent: Wed, Oct 3, 2012 2:58 pm Subject: Re: [Vo]:Brillouin's presentation to Sunrise Securities The mention of the 10MW plant is a proof of concept on which some additional funding is contingent. It does not appear to be a product proposal. Jeff On Wed, Oct 3, 2012 at 8:58 AM, Terry Blanton <[email protected]> wrote: Slide 17 shows their "Power Plant Retrofit Model" showing a 5-10 MW power plant. Most coal-fired plants are at least 100 x that size.