On 2012-12-07 20:41, Jones Beene wrote:
Are there any details? ....Can you post the details here?

I think that page is some sort of parody. I'm not sure it deserves much attention. Here's the text contained within, anyway (there's nothing else besides the "leaked" photo of Rossi's hot Cat from last summer):

LENR
Experimental Procedures

[image - Rossi Hot Cat]


Materials

1.  Magnesium Powder purchased from
http://www.americanpyrosupply.com/NEW_ARRIVALS-MAGNESIUM_POWDER_-325.html
2.  Manganese Chloride, tetra-hydrate from
http://www.ebay.com/itm/321002830228?ssPageName=STRK:MEWNX:IT&_trksid=p3984.m1497.l2649
3.  Clinoptilolite from
http://www.ebay.com/itm/260896687109?ssPageName=STRK:MEWNX:IT&_trksid=p3984.m1497.l2649
4.  Nickel Chloride, Hexa-hydrate from
http://www.ebay.com/itm/390360579618?ssPageName=STRK:MEWNX:IT&_trksid=p3984.m1497.l2649
5.  Thorium Radioactive Mantle from
http://www.ebay.com/itm/160688701248?ssPageName=STRK:MEWNX:IT&_trksid=p3984.m1497.l2649
6.  Ceramic heating elements from
http://www.ebay.com/itm/130379174266?ssPageName=STRK:MEWAX:IT&_trksid=p3984.m1423.l2649

Desired In Situ Reaction

1.  MnCl2(4H2O) + 5Mg => MgCl2 + 4MgO + 8H*
2.  (Clinoptilolite) H2O + Mg =>MgO + 2H* [Assume 26% H2O in Zeolite]
3.  NiCl2(6H2O) + 7Mg => MgCl2 + 6MgO + 12H*
4.  Mg + 2H* => MgH2


Ni Mn 2:1 Trial Proportions

To a 100 gram portion of raw Clinoptilolite calculated amounts (based on gram 
molecular ratios relating to the equations above) of remaining materials are 
combined to achieve a final mix of 85% Clinoptilolite (Dry Basis) 10% Ni and 5% 
Mn. The calculated quantity of Mg was doubled to assure excess reducing 
environment.

Chamber Preparation

A 10 gram sample of the mix prepared above was placed in a standard 4" X 3/8" 
pipe nipple capped and welded at one end.

A 5 mm square portion of the Mantle material was cut up and mixed in.

Teflon tape and a cap were used to loosely cover the open end. This reaction 
chamber was placed inside a PVC tube to
undergo five successive evacuations and flushes with propane.

The reaction chamber was removed and the loose cap thoroughly tightened. With 
one thermocouple and two heating elements (one on each side) it was thoroughly  
wrapped in high temperature insulation.

Seasoning Reaction Chamber



1.  Placed wrapped devise inside 1' length of 3" heavy steel tube.
2.  Proped tube vertically with double layers cement blocks outdoors, top 
covered by small plastic sheet.
3.  Adjust voltage (Variac) up 5 volts every 6 hours.
4.  Cut input at 450 C and allow cool to ambient.

LENR Run

1. Voltage switched on at input cut above.
2. Plot temperature vs time shows substantial slope increase at 150 C.
3. Dummy run without Ni, Mn & Mantle shows no such increase.

Statement

This research is not open. No comments communications, or additional 
information is available. I post this in thanks to the many published documents 
and comments posted by others working in the field, especially Nick Reiter. 
This research was funded solely by myself. My future work is now sponsored with 
a strong NDA prohibiting contact with anyone.

Carlos Ortiz
Guayanilla, PR


Cheers,
S.A.

Reply via email to