Why? I have highly competent, multigenerational engineering contacts at the University of Illinois at C/U. Can they get a demonstration without being drawn into a waste of time?
On Tue, Mar 5, 2013 at 1:04 PM, Alain Sepeda <[email protected]> wrote: > http://futureenergy.ultralightstartups.com/campaign/detail/861 > > 10 days remaining! > > > LENR Distributed Power Units > > By George Miley > >

