They will hardly use such low voltage. Probably something like 100kV and
12A. A small supeconductor line can easily handle that. and you don't need
a power substation, just a lot of batteries in parallel. What I don't
understand is how batteries inside the car can load so fast.


2013/3/6 Terry Blanton <[email protected]>

> This will take around 25 kW for 8 hours or 200 kwh.  To charge at 100%
> efficiency in 10 minutes (one sixth an hour) will take a 1200 kW
> source.  At 220 VAC, we are talking about a 1,200,000 / 220 or 5454
> ampere service.
>
> The recharge station is a.k.a. a power substation.
>
>


-- 
Daniel Rocha - RJ
[email protected]

Reply via email to