As was previously mentioned a long time ago, Debian will be freezing in March.

<pabs3> ok, so the latest release team mail says "we propose freezing
in March 2010."
<pabs3> to transition to testing/squeeze, wz needs 10 days in
unstable, but IIRC as long as it is uploaded before the freeze the
release team will add an exception
<pabs3> and if there are important issues that need fixing, we could
upload beta10 or 2.3.0 before the freeze and get exceptions as needed
<pabs3> info about the Ubuntu debian import freeze:
https://wiki.ubuntu.com/DebianImportFreeze
 <pabs3> https://wiki.ubuntu.com/LucidReleaseSchedule
<pabs3> so February 11th is the Ubuntu -> Debian import freeze
<pabs3> and lucid imports from Debian testing
<pabs3> so 2.3 needs to be in Debian sid before Feb 1st or you'll need
freeze exceptions

Now that that has been said, can I get the current status of what we
have ready or where we are at?

Are we going to meet this deadline or will we need the exception?

_______________________________________________
Warzone-dev mailing list
[email protected]
https://mail.gna.org/listinfo/warzone-dev

Reply via email to