#3118: Demolish structure icon  appears for strucutres which are to yet to be
build.
----------------------------------+--------------------
        Reporter:  monil.gupta@…  |       Type:  bug
          Status:  new            |   Priority:  normal
       Milestone:  unspecified    |  Component:  other
         Version:  3.1_beta1      |   Keywords:
      Blocked By:                 |   Blocking:
Operating System:  Windows 7      |
----------------------------------+--------------------
 Demolish structure icon should not appear on the strutures which are being
 assebled , and a different entity is forced to demolish that strucuture.

 Currently, when a single entity has multiple structures to be build, and a
 different entity is selected and is asked to demolish a structure which is
 yet to be build i.e the structures showing green projection, it actually
 starts building that structure whereas the icon selected displayes
 demolish structure icon.

 Test Steps:
 1.Run Warzone2100.

 2. Select the single player option.

 3. Select the new campaign option.

 4. Select the engineering entity and assemble many structures  from the
 build menu(f3).

 5. Select another entity and demolish the structure which is not
 constructed and is in queue. i.e (The building which is  under
 construction showing the green color projextion.)

 6. Check that the entity starts assembling the structure where asit was
 asked for demolition.

 Result: The icon of demolish shows on the in-build structure.

-- 
Ticket URL: <http://developer.wz2100.net/ticket/3118>
Warzone 2100 Trac <http://developer.wz2100.net/>
The Warzone 2100 Project
_______________________________________________
Warzone-dev mailing list
Warzone-dev@gna.org
https://mail.gna.org/listinfo/warzone-dev

Reply via email to