Hi all,

I have a list of jobs being executed that show the progress of the job. 
 This list refreshes every second and I am wondering if anyone automated 
this before.  I will create then execute the job and continue look at the 
list of jobs until its results return.  The other challenge is my original 
job could move from the #1 spot to lower in the list.

Any thoughts on how to approach this would be greatly appreciated.

Thank you,
Joe

-- 
-- 
Before posting, please read 
https://github.com/watir/watir_meta/wiki/Guidelines-for-Posting-to-Watir-General-Google-Group.
 
In short: search before you ask, be nice.

[email protected]
http://groups.google.com/group/watir-general
[email protected]
--- 
You received this message because you are subscribed to the Google Groups 
"Watir General" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to