On Aug 19, 2008, at 5:12 PM, Chuck Hill wrote:

Is there any chance of using ec.revert() here? Or will that revert too much? Another work around is to do this in a child EC so if they change their mind you can just discard the EC and carry on.

Chuck

In reality, they will likely be adding numerous things see how the rough schedule looks, then they'll decide what they want to make more of, and what they want to schedule on a different manufacturing line or day and then remove those things. Reverting would remove everything, as would discarding the EC. I want them to be able to pick and choose a few things to remove from dozens that they added. This was just my initial test case to add something and take it off, then save.

What I will likely do, since there really isn't anything to be gained by not saving, is to just save after each item, or the batch of items, is added. Then go back and allow them to remove. I was just figuring I'd save myself trips to the DB while they were working with the schedule. The App and DB server are on the same machine so network latency really isn't a problem in this situation, and only a couple people will be using the application at once.

Dave

_______________________________________________
Do not post admin requests to the list. They will be ignored.
Webobjects-dev mailing list      ([email protected])
Help/Unsubscribe/Update your Subscription:
http://lists.apple.com/mailman/options/webobjects-dev/archive%40mail-archive.com

This email sent to [EMAIL PROTECTED]

Reply via email to