Ooops, I just realized I screwed up the math (darn modulo 60
arithmetic!). Here's a table, I'd like to know what some of the
people who have done large deployments think of the cost structure.
What are the hardware, database, and networking costs for each
stage of WO license, assuming a 5K page (kind of low, but perhaps
you've optimized your images and HTML). Also, I don't have any
"server colocation" costs.
In other words, if you've deployed a high-end WO project, how many
transactions per minute can you handle, what did the database cost
you, what did the hardware cost you, and what did the ISP charge you
for the network connection. I'll summarize back to the list.
WO Cost: Database Cost Hardware Network
Level 1 $1000 $0 (use Openbase lite) $4000 (MOSXS) 26K/second
25tpm 1 ISDN
$200/month
Level 2
100tpm $7500 $1000? (Oracle?) $4000 100K/second
1 T1
$1000/month
Level 3 $25,000 $10000? $25,000? 500K/sec
(500 tpm?) 5 T1
$5000/month
Level 4 $25,000 $10000? $50,000? 1MB/sec
(1000 tpm?) 1 T3
$8000/month
Level 5 $50,000 ?????? $200,000? 5MB/sec
(5000 tpm? 1 T3
$8000/month
Level 6 $50,000 ????? $1,000,000? ???
1 DS3
Pierce
----------------------------------------------------------------
Pierce T. Wetter III, Director, Twin Forces, Inc.
e-mail: [EMAIL PROTECTED] Phone:520-779-4227
<http://www.twinforces.com/>
U.S. Mail: 1300 South Milton Rd, Suite 206, Flagstaff, AZ 86001