Sorry, folks, for my idiocracy.  It required a reboot.  I can now see APC
and drill down to the line voltage when creating a new custom service.  So,
I set up the custom service and checked it off on my 3 APC Symmetra devices
in WUG.  However the service is not responding right off the bat.  Not sure
if it has anything to do with the fact that a "scheduled self-test" is
running on all 3 UPSes right now.  I set the voltage threshold at 195.  And
it looks like the current voltage value, through the SNMP graph utility, is
197.  Any ideas??

Chris Powers
Network Systems Engineer
MCSE, CNA, Network+, A+
Keane IT Technical Services
x1730


Please visit http://www.ipswitch.com/support/mailing-lists.html 
to be removed from this list.

An Archive of this list is available at:
http://www.mail-archive.com/whatsup_forum%40list.ipswitch.com/

Reply via email to