On 1/29/07, Martijn Dashorst <[EMAIL PROTECTED]> wrote:
However, I'll publish the distributions before I deploy to an external
repository. Say that we do the final on monday, after *we* checked the
release (better practice our skills at that with this release)?
I'll do the release using our old distribution packages. Can anyone
download those and check them with rat? We will get a lot of errors,
but the idea is that we follow the ASF release methodology.
Which steps are needed?
- build release
- sign release (mvn pgp?)
- check release (rat, manual?)
- release release
Sounds like a plan. When do you want to do it? This weekend?
Eelco