I have these options checked / enabled: - Prompt me to log QSO - Tx disabled after sending 73
Whilst in a JT9 QSO I was transmitting the R +dB sequence. At 35 seconds in I clicked on the 73 button with the intention of preloading the next message in the sequence. When the R +dB sequence completed transmission the Log QSO window opened. I waited for the RRR message to be received and then clicked OK in the Log QSO window. That had the effect of toggling the Enable Tx function off. I noticed that - and clicked Enable TX in time to get the 73 sequence successfully sent. And at the end of that sequence I got another Log QSO pop-up window. It would seem that by my clicking on the 73 button I've set a state somewhere that triggers the prompt for Log QSO no matter what the actual transmission was. And with the other setting (to turn off transmit after 73) this logic results in two unexpected events. Would it be possible to adjust the code such that the post 73 sequence logic is only fired at the end of the real 73 sequence? Bob W1QA _______________________________________________ Wsjt-devel mailing list [email protected] https://lists.berlios.de/mailman/listinfo/wsjt-devel
