|
Jim, The following bugzilla entry is used to
track this enhancement request: https://bugs.eclipse.org/bugs/show_bug.cgi?id=115892. The problem is quiet difficult even if
when making assumptions such as “take the highest version”. The OR
constraints have to be dealt with. The list that you compute might not useable
because of other facets currently selected and their constraints or the
limitations of a runtime. In short, in order to make this work we would need a
pretty sophisticated algorithm that’s capable of picking facets and
versions while taking into account everything around it. Is it ok to change the
version of face x that’s already selected to satisfy my constraint? Maybe
it is; maybe it isn’t; maybe following another OR branch will make
changing the version not necessary. It a lot of these situations, user feedback
will have to be involved. Regards, - Konstantin From:
[EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of Jim Zhang
|
_______________________________________________ wtp-dev mailing list [email protected] https://dev.eclipse.org/mailman/listinfo/wtp-dev

