Our WTP 3.2.4 release (extended maintenance on Helios stream) was due to be
released on 5/13, this Friday.

But, our quality conscious committers found we had introduced a regression
[1] and proposed fixing it, even though it required a re-build during our
"quiet week" which we use as a safety buffer. The WTP PMC agreed, due to
the seriousness of the regression and the safety of the fix.

The rebuild is finished [2], and we have asked for final sign-offs by
(still) 5/13 [3], our original release date, but the WTP PMC decided it
would be prudent to extend the final, official release by one week until
5/20, to (still) allow for one "quiet week" buffer, since any adopters
planning to use this maintenance release will have to pick up the final
build and there is always a small chance they might find some issue with
that final build. This is feasible for this off-cycle maintenance since we
do not need to coordinate with a "Simultaneous Release" for this particular
maintenance release.  The "M-build" [2] is ready to be picked up and tested
and, assuming no blocking problems are found, on 5/20 we will rename to an
R-build, update our repository [4] and officially announce.

Please let us know if this delay impacts anyone in ways we did anticipate.

Thank you,


[1] https://bugs.eclipse.org/bugs/show_bug.cgi?id=345006

[2]
http://download.eclipse.org/webtools/downloads/drops/R3.2.4/M-3.2.4-20110511033327/

[3] http://wiki.eclipse.org/WTP_Smoke_Test_Results_R324_05112011

[4] http://download.eclipse.org/webtools/repository/helios/

_______________________________________________
wtp-dev mailing list
[email protected]
https://dev.eclipse.org/mailman/listinfo/wtp-dev

Reply via email to