Dali defines an extension of the WTP validation extension point
org.eclipse.wst.validation.validatorV2.

What is the appropriate thing for that validator to do when it is executed /after /Dali plug-ins have been stopped and there is no way to perform the validation?

To be more specific: We encounter a race condition during workbench shutdown. If the user shuts down the workbench with unsaved files, s/he will be prompted to save the unsaved files. If the user clicks OK and the files are saved and the files are relevant to Dali, the WTP validation job will be scheduled. In the meantime, the workbench begins its shutdown process, eventually calling the stop(...) method on
the Dali bundle activator. Here is the race:

- If the WTP validation job executes the Dali validator /before/ is our bundle is stopped, things are OK - the bundle will wait for the Dali validator to finish
its work before it stops.

- If the WTP validation job executes the Dali validator /after/ is our bundle is stopped, the Dali validator has no way perform its validation as all the necessary
state has been removed from the various stopped plug-ins.

What should the validator do in the second situation? Should the Dali plug-ins wait for any outstanding WTP validation jobs to complete before stopping? Is there a way to force the Dali validation to be re-executed during the following workbench
start-up? Etc....

Thanks.
Brian

_______________________________________________
wtp-dev mailing list
[email protected]
https://dev.eclipse.org/mailman/listinfo/wtp-dev

Reply via email to