There has been talk in #ubuntu-quality about a new method of following specific packages throughout the whole cycle, rather than for a week at a time.

This is in addition to the current image testing which will still go on at http://iso.qa.ubuntu.com/qatracker/milestones/270/builds

We have some example/prototypes (these are likely to change with no notice, hence the current screenshots as attached) to look at

   http://packages.qa.dev.stgraber.org/qatracker/milestones/252/builds [1]


which is an overview of packages that we can follow, or

   http://packages.qa.dev.stgraber.org/qatracker/milestones/253/history
   [2]


which is following one package throughout the whole cycle.

I prefer the 2nd more detailed type - we can follow things for as short or long a time as we want to, and given that we quite often are looking for people to test things at short notice it could well be helpful to the way we have to work.

What we need to know now, apart from thoughts on the whole idea, is what packages the team thinks we should use this for.

Personally I can see a case for both short and long milestones, if we get xfce4.12 into the mix then I'd assume having the ability to watch bugs and test for longer periods is going to help us as a team.


The over-riding point being that we can use this new system how we want to.

Regards

Elfy

for the QA team

[1] http://imagebin.org/258482

[2] http://imagebin.org/258483

--
Ubuntu Forum Council Member

-- 
xubuntu-devel mailing list
[email protected]
https://lists.ubuntu.com/mailman/listinfo/xubuntu-devel

Reply via email to