[
https://issues.apache.org/jira/browse/YARN-429?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Arun C Murthy closed YARN-429.
------------------------------
> capacity-scheduler config missing from yarn-test artifact
> ---------------------------------------------------------
>
> Key: YARN-429
> URL: https://issues.apache.org/jira/browse/YARN-429
> Project: Hadoop YARN
> Issue Type: Bug
> Components: resourcemanager
> Affects Versions: 2.0.3-alpha
> Reporter: Siddharth Seth
> Assignee: Siddharth Seth
> Priority: Blocker
> Fix For: 2.0.4-alpha
>
> Attachments: YARN-429.txt
>
>
> MiniYARNCluster and MiniMRCluster are unusable by downstream projects with
> the 2.0.3-alpha release, since the capacity-scheduler configuration is
> missing from the test artifact.
> hadoop-yarn-server-tests-3.0.0-SNAPSHOT-tests.jar should include the default
> capacity-scheduler configuration. Also, this doesn't need to be part of the
> default classpath - and should be moved out of the top level directory in the
> dist package.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira