Got swamped again.

We already have about 112 patches in 2.7.2 already.

There are 15 open tickets in progress. I’ll push progress on them for an RC 
towards end of this week.

Thanks
+Vinod

On Sep 25, 2015, at 3:27 PM, Vinod Kumar Vavilapalli 
<vino...@apache.org<mailto:vino...@apache.org>> wrote:

Hi all,

We released 2.7.1 nearly 2.5 months ago. I got caught up with a very long 
release process for 2.6.1 so couldn't make progress on a 2.7.2. Now is the time!

Things to do

 (#1) Branch
    -- Branch 2.7 has been open to 2.7.2 commits for a while.
    -- In order to converge on a release, I will branch out 2.7.2 soon.

  (#2) Patches
    -- 2.7.2 already has a boat load [1] of fixes.
    -- The list of open blocker / critical tickets [2] is not small. I'll start 
triaging and see what can make it in a week or so of time.

  (#3) Release
    -- Even if we can get half of the blocker / critical tickets in, the full 
list [3] will be big enough for us to start voting on an RC in no less than a 
week.
    -- Leaving aside some buffer time, I plan to start RC process by end of 
first week of October.

Thoughts?

Appreciate help in moving open tickets [2] forward.

A general note:  Please consider putting any critical / blocker tickets on 2.8 
into 2.6.2 and 2.7.2 releases.

Thanks
+Vinod

[1] 2.7.2 Fixed Tickets: https://issues.apache.org/jira/issues/?filter=12333473
[2] 2.7.2 Open Blockers / Critical Tickets: 
https://issues.apache.org/jira/issues/?filter=12332867
[3] 2.7.2 Release Tickets: 
https://issues.apache.org/jira/issues/?filter=12333461