zhengchenyu created YARN-6407:
---------------------------------
Summary: Improve and fix locks of RM scheduler
Key: YARN-6407
URL: https://issues.apache.org/jira/browse/YARN-6407
Project: Hadoop YARN
Issue Type: Bug
Components: fairscheduler
Affects Versions: 2.7.1
Environment: CentOS 7, 1 Gigabit Ethernet
Reporter: zhengchenyu
Fix For: 2.7.1
First,this issue dose not duplicate the YARN-3091.
In our cluster, we have 5k nodes, and the server is configured with 1 Gigabit
Ethernet. So network is bottleneck in our cluster.
We must distcp data from warehouse, because of 1 Gigabit Ethernet, we must set
yarn.scheduler.fair.max.assign to 5, or must lead to hotspot.
The setting that max.assign is 5 lead to the assigned ability decreased. So we
start the ContinuousSchedulingThread.
As more applicaitons running in our cluster , and with
ContinuousSchedulingThread, the problem of lock contention is more serious.
In our cluster, the callqueue of ApplicationMasterSeriver's rpc is high
occasionally. we worried that more problem occure in future with more
application are running.
Here is our logical graph:
"1 Gigabit Ethernet" and "data hot spot" ==> "set
yarn.scheduler.fair.max.assign to 5" ==> "ContinuousSchedulingThread is
started" and "more applcations" => "lock contention"
I know YARN-3091 solved this problem, but the patch aims that change the object
lock to read write lock. This change is still Coarse-Grained. So I think we
lock the resources or not lock the large section code.
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]