Wilfred Spiegelenburg created YARN-6490:
-------------------------------------------
Summary: Turn on assign multiple after removing continuous
scheduling
Key: YARN-6490
URL: https://issues.apache.org/jira/browse/YARN-6490
Project: Hadoop YARN
Issue Type: Sub-task
Reporter: Wilfred Spiegelenburg
Assignee: Wilfred Spiegelenburg
To help loading up a cluster when not using continuous scheduling change the
default for {{yarn.scheduler.fair.assignmultiple}} from {{false}} to {{true}}.
This requires the change from YARN-5035 to make sure that we leverage assigning
more than one container to a node per heartbeat.
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]