[
https://issues.apache.org/jira/browse/YARN-2?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13539181#comment-13539181
]
Hadoop QA commented on YARN-2:
------------------------------
{color:red}-1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12562305/YARN-2.patch
against trunk revision .
{color:green}+1 @author{color}. The patch does not contain any @author
tags.
{color:green}+1 tests included{color}. The patch appears to include 13 new
or modified test files.
{color:green}+1 javac{color}. The applied patch does not increase the
total number of javac compiler warnings.
{color:red}-1 javadoc{color}. The javadoc tool appears to have generated 2
warning messages.
{color:green}+1 eclipse:eclipse{color}. The patch built with
eclipse:eclipse.
{color:red}-1 findbugs{color}. The patch appears to introduce 3 new
Findbugs (version 1.3.9) warnings.
{color:green}+1 release audit{color}. The applied patch does not increase
the total number of release audit warnings.
{color:green}+1 core tests{color}. The patch passed unit tests in
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-api
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-common
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-nodemanager
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager.
{color:green}+1 contrib tests{color}. The patch passed contrib unit tests.
Test results:
https://builds.apache.org/job/PreCommit-YARN-Build/254//testReport/
Findbugs warnings:
https://builds.apache.org/job/PreCommit-YARN-Build/254//artifact/trunk/patchprocess/newPatchFindbugsWarningshadoop-yarn-server-resourcemanager.html
Console output: https://builds.apache.org/job/PreCommit-YARN-Build/254//console
This message is automatically generated.
> Enhance CS to schedule accounting for both memory and cpu cores
> ---------------------------------------------------------------
>
> Key: YARN-2
> URL: https://issues.apache.org/jira/browse/YARN-2
> Project: Hadoop YARN
> Issue Type: New Feature
> Components: capacityscheduler, scheduler
> Reporter: Arun C Murthy
> Assignee: Arun C Murthy
> Fix For: 2.0.3-alpha
>
> Attachments: MAPREDUCE-4327.patch, MAPREDUCE-4327.patch,
> MAPREDUCE-4327.patch, MAPREDUCE-4327-v2.patch, MAPREDUCE-4327-v3.patch,
> MAPREDUCE-4327-v4.patch, MAPREDUCE-4327-v5.patch, YARN-2-help.patch,
> YARN-2.patch, YARN-2.patch, YARN-2.patch, YARN-2.patch
>
>
> With YARN being a general purpose system, it would be useful for several
> applications (MPI et al) to specify not just memory but also CPU (cores) for
> their resource requirements. Thus, it would be useful to the
> CapacityScheduler to account for both.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira