[ https://issues.apache.org/jira/browse/YARN-209?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13609601#comment-13609601 ]
Hadoop QA commented on YARN-209: -------------------------------- {color:red}-1 overall{color}. Here are the results of testing the latest attachment http://issues.apache.org/jira/secure/attachment/12574896/YARN-209.2.patch against trunk revision . {color:green}+1 @author{color}. The patch does not contain any @author tags. {color:green}+1 tests included{color}. The patch appears to include 1 new or modified test files. {color:green}+1 tests included appear to have a timeout.{color} {color:green}+1 javac{color}. The applied patch does not increase the total number of javac compiler warnings. {color:green}+1 javadoc{color}. The javadoc tool did not generate any warning messages. {color:red}-1 eclipse:eclipse{color}. The patch failed to build with eclipse:eclipse. {color:green}+1 findbugs{color}. The patch does not introduce any new Findbugs (version 1.3.9) warnings. {color:green}+1 release audit{color}. The applied patch does not increase the total number of release audit warnings. {color:red}-1 core tests{color}. The patch failed these unit tests in hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager: org.apache.hadoop.yarn.server.resourcemanager.TestRMRestart {color:green}+1 contrib tests{color}. The patch passed contrib unit tests. Test results: https://builds.apache.org/job/PreCommit-YARN-Build/564//testReport/ Console output: https://builds.apache.org/job/PreCommit-YARN-Build/564//console This message is automatically generated. > Capacity scheduler can leave application in pending state > --------------------------------------------------------- > > Key: YARN-209 > URL: https://issues.apache.org/jira/browse/YARN-209 > Project: Hadoop YARN > Issue Type: Bug > Reporter: Bikas Saha > Assignee: Zhijie Shen > Fix For: 3.0.0 > > Attachments: YARN-209.1.patch, YARN-209.2.patch, YARN-209-test.patch > > > Say application A is submitted but at that time it does not meet the bar for > activation because of resource limit settings for applications. After that if > more hardware is added to the system and the application becomes valid it > still remains in pending state, likely forever. > This might be rare to hit in real life because enough NM's heartbeat to the > RM before applications can get submitted. But a change in settings or > heartbeat interval might make it easier to repro. In RM restart scenarios, > this will likely hit more if its implemented by re-playing events and > re-submitting applications to the scheduler before the RPC to NM's is > activated. -- This message is automatically generated by JIRA. If you think it was sent incorrectly, please contact your JIRA administrators For more information on JIRA, see: http://www.atlassian.com/software/jira