[
https://issues.apache.org/jira/browse/YARN-276?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13675840#comment-13675840
]
Hadoop QA commented on YARN-276:
--------------------------------
{color:green}+1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12586295/YARN-276.patch
against trunk revision .
{color:green}+1 @author{color}. The patch does not contain any @author
tags.
{color:green}+1 tests included{color}. The patch appears to include 6 new
or modified test files.
{color:green}+1 javac{color}. The applied patch does not increase the
total number of javac compiler warnings.
{color:green}+1 javadoc{color}. The javadoc tool did not generate any
warning messages.
{color:green}+1 eclipse:eclipse{color}. The patch built with
eclipse:eclipse.
{color:green}+1 findbugs{color}. The patch does not introduce any new
Findbugs (version 1.3.9) warnings.
{color:green}+1 release audit{color}. The applied patch does not increase
the total number of release audit warnings.
{color:green}+1 core tests{color}. The patch passed unit tests in
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-tests.
{color:green}+1 contrib tests{color}. The patch passed contrib unit tests.
Test results:
https://builds.apache.org/job/PreCommit-YARN-Build/1122//testReport/
Console output: https://builds.apache.org/job/PreCommit-YARN-Build/1122//console
This message is automatically generated.
> Capacity Scheduler can hang when submit many jobs concurrently
> --------------------------------------------------------------
>
> Key: YARN-276
> URL: https://issues.apache.org/jira/browse/YARN-276
> Project: Hadoop YARN
> Issue Type: Bug
> Components: capacityscheduler
> Affects Versions: 3.0.0, 2.0.1-alpha
> Reporter: nemon lou
> Assignee: nemon lou
> Labels: incompatible
> Attachments: YARN-276.patch, YARN-276.patch, YARN-276.patch,
> YARN-276.patch, YARN-276.patch, YARN-276.patch, YARN-276.patch,
> YARN-276.patch, YARN-276.patch, YARN-276.patch, YARN-276.patch,
> YARN-276.patch, YARN-276.patch, YARN-276.patch, YARN-276.patch
>
> Original Estimate: 24h
> Remaining Estimate: 24h
>
> In hadoop2.0.1,When i submit many jobs concurrently at the same time,Capacity
> scheduler can hang with most resources taken up by AM and don't have enough
> resources for tasks.And then all applications hang there.
> The cause is that "yarn.scheduler.capacity.maximum-am-resource-percent" not
> check directly.Instead ,this property only used for maxActiveApplications.
> And maxActiveApplications is computed by minimumAllocation (not by Am
> actually used).
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira