[ 
https://issues.apache.org/jira/browse/YARN-5774?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15765605#comment-15765605
 ] 

Yufei Gu commented on YARN-5774:
--------------------------------

Hi [~wangda], I understand what you mean. 
I don't think it is an incompatible change. The {{setCapability()}} and 
{{getCapability()}} are still there and public/stable in each class. The only 
problem I see is that {{AbstractResourceRequest}} should be public/stable 
instead of public/unstable. I'll file a jira for that. 

> MR Job stuck in ACCEPTED status without any progress in Fair Scheduler if set 
> yarn.scheduler.minimum-allocation-mb to 0.
> ------------------------------------------------------------------------------------------------------------------------
>
>                 Key: YARN-5774
>                 URL: https://issues.apache.org/jira/browse/YARN-5774
>             Project: Hadoop YARN
>          Issue Type: Bug
>          Components: resourcemanager
>    Affects Versions: 3.0.0-alpha1
>            Reporter: Yufei Gu
>            Assignee: Yufei Gu
>              Labels: oct16-easy
>             Fix For: 2.8.0, 3.0.0-alpha2
>
>         Attachments: YARN-5774.001.patch, YARN-5774.002.patch, 
> YARN-5774.003.patch, YARN-5774.004.patch, YARN-5774.005.patch, 
> YARN-5774.006.patch, YARN-5774.007.patch
>
>
> MR Job stuck in ACCEPTED status without any progress in Fair Scheduler 
> because there is no resource request for the AM. This happened when you 
> configure {{yarn.scheduler.minimum-allocation-mb}} to zero.
> The problem is in the code used by both Capacity Scheduler and Fair 
> Scheduler. {{scheduler.increment-allocation-mb}} is a concept in FS, but not 
> CS. So the common code in class RMAppManager passes the 
> {{yarn.scheduler.minimum-allocation-mb}} as incremental one because there is 
> no incremental one for CS when it tried to normalize the resource requests.
> {code}
>      SchedulerUtils.normalizeRequest(amReq, scheduler.getResourceCalculator(),
>           scheduler.getClusterResource(),
>           scheduler.getMinimumResourceCapability(),
>           scheduler.getMaximumResourceCapability(),
>           scheduler.getMinimumResourceCapability());  --> incrementResource 
> should be passed here.
> {code}



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

---------------------------------------------------------------------
To unsubscribe, e-mail: yarn-issues-unsubscr...@hadoop.apache.org
For additional commands, e-mail: yarn-issues-h...@hadoop.apache.org

Reply via email to