He Tianyi updated YARN-6101:
----------------------------
    Description: 
We observed that, in today's cluster, usage of Spark has dramatically 
increased. 
This introduced a new issue that CPU/MEM utilization for single node may become 
imbalanced due to Spark is generally more memory intensive. For example, after 
a node with capability (48 cores, 192 GB memory) cannot satisfy a (1 core, 2 GB 
memory) request if current used resource is (20 cores, 191 GB memory), with 
plenty of total available resource across the whole cluster.
A thought for avoiding the situation is to introduce some strategy during 
scheduling.
This JIRA proposes a delay-scheduling-alike approach to achieve better balance 
between different type of resources on each node.
The basic idea is consider dominant resource for each node, and when a 
scheduling opportunity on a particular node is offered to a resource request, 
better make sure the allocation is changing dominant resource of the node, or, 
in worst case, allocate at once when number of offered scheduling opportunities 
exceeds a certain number.
With YARN SLS and a simulation file with hybrid workload (MR+Spark), the 
approach improved cluster resource usage by nearly 5%. And after deployed to 
production, we observed a 8% improvement.

  was:
We observed that, in today's cluster, usage of Spark has dramatically 
increased. 
This introduced a new issue that CPU/MEM utilization for single node may become 
imbalanced due to Spark is generally more memory intensive. For example, after 
a node with capability (48 cores, 192 GB memory) cannot satisfy a (1 core, 2 GB 
memory) request if current used resource is (20 cores, 190 GB memory), with 
plenty of total available resource across the whole cluster.
A thought for avoiding the situation is to introduce some strategy during 
scheduling.
This JIRA proposes a delay-scheduling-alike approach to achieve better balance 
between different type of resources on each node.
The basic idea is consider dominant resource for each node, and when a 
scheduling opportunity on a particular node is offered to a resource request, 
better make sure the allocation is changing dominant resource of the node, or, 
in worst case, allocate at once when number of offered scheduling opportunities 
exceeds a certain number.
With YARN SLS and a simulation file with hybrid workload (MR+Spark), the 
approach improved cluster resource usage by nearly 5%. And after deployed to 
production, we observed a 8% improvement.


> Delay scheduling for node resource balance
> ------------------------------------------
>
>                 Key: YARN-6101
>                 URL: https://issues.apache.org/jira/browse/YARN-6101
>             Project: Hadoop YARN
>          Issue Type: Improvement
>          Components: fairscheduler
>            Reporter: He Tianyi
>            Priority: Minor
>         Attachments: YARN-6101.preliminary.0000.patch
>
>
> We observed that, in today's cluster, usage of Spark has dramatically 
> increased. 
> This introduced a new issue that CPU/MEM utilization for single node may 
> become imbalanced due to Spark is generally more memory intensive. For 
> example, after a node with capability (48 cores, 192 GB memory) cannot 
> satisfy a (1 core, 2 GB memory) request if current used resource is (20 
> cores, 191 GB memory), with plenty of total available resource across the 
> whole cluster.
> A thought for avoiding the situation is to introduce some strategy during 
> scheduling.
> This JIRA proposes a delay-scheduling-alike approach to achieve better 
> balance between different type of resources on each node.
> The basic idea is consider dominant resource for each node, and when a 
> scheduling opportunity on a particular node is offered to a resource request, 
> better make sure the allocation is changing dominant resource of the node, 
> or, in worst case, allocate at once when number of offered scheduling 
> opportunities exceeds a certain number.
> With YARN SLS and a simulation file with hybrid workload (MR+Spark), the 
> approach improved cluster resource usage by nearly 5%. And after deployed to 
> production, we observed a 8% improvement.



--