[ 
https://issues.apache.org/jira/browse/YARN-7247?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16178926#comment-16178926
 ] 

balloons edited comment on YARN-7247 at 9/25/17 12:14 PM:
----------------------------------------------------------

[~templedf] Thank templedf. But it was a very difficult choice for us: 
* Turning on the dynamic assignment will cause the same resource consumption 
type of container placed on one node.
* Turning off the dynamic assignment will lead to very bad scheduling 
performance.

So, I want the fair scheduler to support turn on multi assignments, but each 
time the resource is allocated to a different application.
What do you think?


was (Author: balloons):
[~templedf] Thank templedf. But it was a very difficult choice for us: 
* Turning on the dynamic assignment will cause the same resource consumption 
type of container placed on one node.
* Turning off the dynamic assignment will lead to very bad scheduling 
performance.

So, I want the fair scheduler to support turn on multi assignments, but each 
time the resource is allocated to a different node.
What do you think?

> Assign multiple will lead to hot point problems of physical resource 
> consumption
> --------------------------------------------------------------------------------
>
>                 Key: YARN-7247
>                 URL: https://issues.apache.org/jira/browse/YARN-7247
>             Project: Hadoop YARN
>          Issue Type: Bug
>          Components: fairscheduler
>            Reporter: balloons
>            Assignee: Daniel Templeton
>




--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to