[
https://issues.apache.org/jira/browse/YARN-7247?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16178926#comment-16178926
]
balloons edited comment on YARN-7247 at 9/25/17 12:14 PM:
----------------------------------------------------------
[~templedf] Thank templedf. But it was a very difficult choice for us:
* Turning on the dynamic assignment will cause the same resource consumption
type of container placed on one node.
* Turning off the dynamic assignment will lead to very bad scheduling
performance.
So, I want the fair scheduler to support turn on multi assignments, but each
time the resource is allocated to a different application.
What do you think?
was (Author: balloons):
[~templedf] Thank templedf. But it was a very difficult choice for us:
* Turning on the dynamic assignment will cause the same resource consumption
type of container placed on one node.
* Turning off the dynamic assignment will lead to very bad scheduling
performance.
So, I want the fair scheduler to support turn on multi assignments, but each
time the resource is allocated to a different node.
What do you think?
> Assign multiple will lead to hot point problems of physical resource
> consumption
> --------------------------------------------------------------------------------
>
> Key: YARN-7247
> URL: https://issues.apache.org/jira/browse/YARN-7247
> Project: Hadoop YARN
> Issue Type: Bug
> Components: fairscheduler
> Reporter: balloons
> Assignee: Daniel Templeton
>
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]