https://issues.apache.org/jira/browse/YARN-5139?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Wangda Tan updated YARN-5139:
-----------------------------
    Description: 
Existing YARN scheduler is based on node heartbeat. This can lead to 
sub-optimal decisions because scheduler can only look at one node at the time 
when scheduling resources.

Pseudo code of existing scheduling logic looks like:
{code}
for node in allNodes:
   Go to parentQueue
      Go to leafQueue
        for application in leafQueue.applications:
           for resource-request in application.resource-requests
              try to schedule on node
{code}

Considering future complex resource placement requirements, such as node 
constraints (give me "a && b || c") or anti-affinity (do not allocate HBase 
regionsevers and Storm workers on the same host), we may need to consider 
moving YARN scheduler towards global scheduling.

{color:red}Running design doc: 
https://docs.google.com/document/d/1rY-CJPLbGk3Xj_8sxre61y2YkHJFK8oqKOshro1ZY3A/edit#heading=h.xnzvh9nn283a{color}

  was:
Existing YARN scheduler is based on node heartbeat. This can lead to 
sub-optimal decisions because scheduler can only look at one node at the time 
when scheduling resources.

Pseudo code of existing scheduling logic looks like:
{code}
for node in allNodes:
   Go to parentQueue
      Go to leafQueue
        for application in leafQueue.applications:
           for resource-request in application.resource-requests
              try to schedule on node
{code}

Considering future complex resource placement requirements, such as node 
constraints (give me "a && b || c") or anti-affinity (do not allocate HBase 
regionsevers and Storm workers on the same host), we may need to consider 
moving YARN scheduler towards global scheduling.


> [Umbrella] Move YARN scheduler towards global scheduler
> -------------------------------------------------------
>
>                 Key: YARN-5139
>                 URL: https://issues.apache.org/jira/browse/YARN-5139
>             Project: Hadoop YARN
>          Issue Type: New Feature
>            Reporter: Wangda Tan
>            Assignee: Wangda Tan
>         Attachments: Explanantions of Global Scheduling (YARN-5139) 
> Implementation.pdf, YARN-5139-Concurrent-scheduling-performance-report.pdf, 
> YARN-5139-Global-Schedulingd-esign-and-implementation-notes-v2.pdf, 
> YARN-5139-Global-Schedulingd-esign-and-implementation-notes.pdf, 
> YARN-5139.000.patch, wip-1.YARN-5139.patch, wip-2.YARN-5139.patch, 
> wip-3.YARN-5139.patch, wip-4.YARN-5139.patch, wip-5.YARN-5139.patch
>
>
> Existing YARN scheduler is based on node heartbeat. This can lead to 
> sub-optimal decisions because scheduler can only look at one node at the time 
> when scheduling resources.
> Pseudo code of existing scheduling logic looks like:
> {code}
> for node in allNodes:
>    Go to parentQueue
>       Go to leafQueue
>         for application in leafQueue.applications:
>            for resource-request in application.resource-requests
>               try to schedule on node
> {code}
> Considering future complex resource placement requirements, such as node 
> constraints (give me "a && b || c") or anti-affinity (do not allocate HBase 
> regionsevers and Storm workers on the same host), we may need to consider 
> moving YARN scheduler towards global scheduling.
> {color:red}Running design doc: 
> https://docs.google.com/document/d/1rY-CJPLbGk3Xj_8sxre61y2YkHJFK8oqKOshro1ZY3A/edit#heading=h.xnzvh9nn283a{color}



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to