Wangda Tan created YARN-8459:
--------------------------------
Summary: Capacity Scheduler should properly handle container
allocation on app/node when app/node being removed by scheduler
Key: YARN-8459
URL: https://issues.apache.org/jira/browse/YARN-8459
Project: Hadoop YARN
Issue Type: Bug
Reporter: Wangda Tan
Assignee: Wangda Tan
Thanks [~gopalv] for reporting this issue.
In async mode, capacity scheduler can allocate/reserve containers on node/app
when node/app is being removed ({{doneApplicationAttempt}}/{{removeNode}}).
This will cause some issues, for example.
a. Container for app_1 reserved on node_x.
b. At the same time, app_1 is being removed.
c. Reserve on node operation finished after app_1 removed
({{doneApplicationAttempt}}).
For all the future runs, the node_x is completely blocked by the invalid
reservation. It keep reporting "Trying to schedule for a finished app, please
double check" for the node_x.
We need a fix to make sure this won't happen.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]