[
https://issues.apache.org/jira/browse/YARN-9326?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16885103#comment-16885103
]
Hadoop QA commented on YARN-9326:
---------------------------------
| (x) *{color:red}-1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:blue}0{color} | {color:blue} reexec {color} | {color:blue} 0m
0s{color} | {color:blue} Docker mode activated. {color} |
| {color:red}-1{color} | {color:red} patch {color} | {color:red} 0m 7s{color}
| {color:red} YARN-9326 does not apply to trunk. Rebase required? Wrong Branch?
See https://wiki.apache.org/hadoop/HowToContribute for help. {color} |
\\
\\
|| Subsystem || Report/Notes ||
| JIRA Issue | YARN-9326 |
| JIRA Patch URL |
https://issues.apache.org/jira/secure/attachment/12961406/YARN-9326.005.patch |
| Console output |
https://builds.apache.org/job/PreCommit-YARN-Build/24393/console |
| Powered by | Apache Yetus 0.8.0 http://yetus.apache.org |
This message was automatically generated.
> Fair Scheduler configuration defaults are not documented in case of min and
> maxResources
> ----------------------------------------------------------------------------------------
>
> Key: YARN-9326
> URL: https://issues.apache.org/jira/browse/YARN-9326
> Project: Hadoop YARN
> Issue Type: Improvement
> Components: docs, documentation, fairscheduler, yarn
> Affects Versions: 3.2.0
> Reporter: Adam Antal
> Assignee: Adam Antal
> Priority: Major
> Attachments: YARN-9326.001.patch, YARN-9326.002.patch,
> YARN-9326.003.patch, YARN-9326.004.patch, YARN-9326.005.patch
>
>
> The FairScheduler's configuration has the following defaults (from the code:
> javadoc):
> {noformat}
> In new style resources, any resource that is not specified will be set to
> missing or 0%, as appropriate. Also, in the new style resources, units are
> not allowed. Units are assumed from the resource manager's settings for the
> resources when the value isn't a percentage. The missing parameter is only
> used in the case of new style resources without percentages. With new style
> resources with percentages, any missing resources will be assumed to be 100%
> because percentages are only used with maximum resource limits.
> {noformat}
> This is not documented in the hadoop yarn site FairScheduler.html. It is
> quite intuitive, but still need to be documented though.
--
This message was sent by Atlassian JIRA
(v7.6.14#76016)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]