[ 
https://issues.apache.org/jira/browse/YARN-10965?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Andras Gyori updated YARN-10965:
--------------------------------
    Description: With the introduction of YARN-10930 it is possible to unify 
queue resource calculation. In order to narrow down the scope of this patch, 
the base system is implemented here, without refactoring the existing resource 
calculation in updateClusterResource (which will be done in YARN-11000).  (was: 
With the introduction of YARN-10930 it is possible to unify queue resource 
calculation. In order to narrow down the scope of this patch, the base system 
is implemented here, without refactoring the existing resource calculation in 
updateClusterResource (which will be done in a different jira).)

> Centralize queue resource calculation based on CapacityVectors
> --------------------------------------------------------------
>
>                 Key: YARN-10965
>                 URL: https://issues.apache.org/jira/browse/YARN-10965
>             Project: Hadoop YARN
>          Issue Type: Sub-task
>          Components: capacity scheduler
>            Reporter: Andras Gyori
>            Assignee: Andras Gyori
>            Priority: Major
>              Labels: pull-request-available
>          Time Spent: 50m
>  Remaining Estimate: 0h
>
> With the introduction of YARN-10930 it is possible to unify queue resource 
> calculation. In order to narrow down the scope of this patch, the base system 
> is implemented here, without refactoring the existing resource calculation in 
> updateClusterResource (which will be done in YARN-11000).



--
This message was sent by Atlassian Jira
(v8.20.1#820001)

---------------------------------------------------------------------
To unsubscribe, e-mail: yarn-issues-unsubscr...@hadoop.apache.org
For additional commands, e-mail: yarn-issues-h...@hadoop.apache.org

Reply via email to