[ 
https://issues.apache.org/jira/browse/YARN-11070?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17496691#comment-17496691
 ] 

András Győri commented on YARN-11070:
-------------------------------------

Thanks [~snemeth] for the commit. It seems that in older branches the 
effectiveRatio was calculated in a local variable per label, therefore not 
affected by this issue.

> Minimum resource ratio is overridden by subsequent labels
> ---------------------------------------------------------
>
>                 Key: YARN-11070
>                 URL: https://issues.apache.org/jira/browse/YARN-11070
>             Project: Hadoop YARN
>          Issue Type: Bug
>          Components: yarn
>            Reporter: Andras Gyori
>            Assignee: Andras Gyori
>            Priority: Major
>              Labels: pull-request-available
>             Fix For: 3.4.0
>
>          Time Spent: 40m
>  Remaining Estimate: 0h
>
> effectiveMinRatioPerResource is used in the downscaling process when using 
> absolute resources. It is correctly calculated for all labels, however, 
> effectiveMinRatioPerResource is overridden in each iteration. This results 
> that the normalisation ratios are used in further calculations based on the 
> last label.



--
This message was sent by Atlassian Jira
(v8.20.1#820001)

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to