[
https://issues.apache.org/jira/browse/YARN-10965?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Szilard Nemeth resolved YARN-10965.
-----------------------------------
Hadoop Flags: Reviewed
Resolution: Fixed
> Centralize queue resource calculation based on CapacityVectors
> --------------------------------------------------------------
>
> Key: YARN-10965
> URL: https://issues.apache.org/jira/browse/YARN-10965
> Project: Hadoop YARN
> Issue Type: Sub-task
> Components: capacity scheduler
> Reporter: Andras Gyori
> Assignee: Andras Gyori
> Priority: Major
> Labels: pull-request-available
> Fix For: 3.4.0
>
> Time Spent: 6.5h
> Remaining Estimate: 0h
>
> With the introduction of YARN-10930 it is possible to unify queue resource
> calculation. In order to narrow down the scope of this patch, the base system
> is implemented here, without refactoring the existing resource calculation in
> updateClusterResource (which will be done in YARN-11000).
--
This message was sent by Atlassian Jira
(v8.20.10#820010)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]