[ 
https://issues.apache.org/jira/browse/YARN-1913?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14015823#comment-14015823
 ] 

Hadoop QA commented on YARN-1913:
---------------------------------

{color:red}-1 overall{color}.  Here are the results of testing the latest 
attachment 
  http://issues.apache.org/jira/secure/attachment/12647968/YARN-1913.patch
  against trunk revision .

    {color:green}+1 @author{color}.  The patch does not contain any @author 
tags.

    {color:green}+1 tests included{color}.  The patch appears to include 3 new 
or modified test files.

    {color:green}+1 javac{color}.  The applied patch does not increase the 
total number of javac compiler warnings.

    {color:green}+1 javadoc{color}.  There were no new javadoc warning messages.

    {color:green}+1 eclipse:eclipse{color}.  The patch built with 
eclipse:eclipse.

    {color:green}+1 findbugs{color}.  The patch does not introduce any new 
Findbugs (version 1.3.9) warnings.

    {color:green}+1 release audit{color}.  The applied patch does not increase 
the total number of release audit warnings.

    {color:red}-1 core tests{color}.  The patch failed these unit tests in 
hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager:

                  
org.apache.hadoop.yarn.server.resourcemanager.scheduler.fair.TestMaxRunningAppsEnforcer
                  
org.apache.hadoop.yarn.server.resourcemanager.scheduler.TestSchedulerApplicationAttempt
                  
org.apache.hadoop.yarn.server.resourcemanager.scheduler.fair.TestFSSchedulerApp

    {color:green}+1 contrib tests{color}.  The patch passed contrib unit tests.

Test results: 
https://builds.apache.org/job/PreCommit-YARN-Build/3890//testReport/
Console output: https://builds.apache.org/job/PreCommit-YARN-Build/3890//console

This message is automatically generated.

> With Fair Scheduler, cluster can logjam when all resources are consumed by AMs
> ------------------------------------------------------------------------------
>
>                 Key: YARN-1913
>                 URL: https://issues.apache.org/jira/browse/YARN-1913
>             Project: Hadoop YARN
>          Issue Type: Bug
>          Components: scheduler
>    Affects Versions: 2.3.0
>            Reporter: bc Wong
>            Assignee: Wei Yan
>         Attachments: YARN-1913.patch, YARN-1913.patch, YARN-1913.patch, 
> YARN-1913.patch, YARN-1913.patch, YARN-1913.patch, YARN-1913.patch, 
> YARN-1913.patch, YARN-1913.patch, YARN-1913.patch
>
>
> It's possible to deadlock a cluster by submitting many applications at once, 
> and have all cluster resources taken up by AMs.
> One solution is for the scheduler to limit resources taken up by AMs, as a 
> percentage of total cluster resources, via a "maxApplicationMasterShare" 
> config.



--
This message was sent by Atlassian JIRA
(v6.2#6252)

Reply via email to